Cart
Articles 0
Products for the sum 0 PLN
Delivery
Total
Show checkout

Citroën e-C4 (2022) Repair: Troubleshooting an On-Board Charger (OBC) Failure

Problem

The electric vehicle completely lost its ability to drive and charge following a series of critical failures in the high-voltage system. The dealership's service department was unable to resolve the issue during the three-month period the vehicle was out of service.

Result

A comprehensive computer diagnostic test was performed, a faulty on-board charger (OBC) was identified, and it was replaced. The owner received a fully functional car much faster.

Fault codes
U12DE
Error codes
U12DE, P1A71, P0AF8
Citroën e-C4 (2022) Repair: Troubleshooting an On-Board Charger (OBC) Failure

The owner of a 2022 Citroën e-C4 electric crossover contacted STS.Electro. The problem developed gradually:

  1. First, a warning about a malfunction in the pre-collision emergency braking system appeared on the instrument panel.
  2. Later, a critical warning about an electrical system failure popped up, after which the car completely stopped charging.

The customer visited an authorized service center (ASO), where the electric vehicle sat for about 3 months. After two weeks of inactivity, the car was successfully started, but it did not respond at all to the gear selector and remained stationary. Since the dealer could not provide a clear timeline for resolving the issue, the owner decided to retrieve the car and entrust it to the specialists at STS.Electro. Upon arrival at our service center, the e-C4 was brought in by tow truck and was completely immobilized.

Step-by-step workflow

Click a photo to view it in full.

  1. Step 1 of 3

    Computer Diagnostics and Error Code Analysis

    When connecting the diagnostic equipment, STS.Electro specialists read the following error codes in the high-voltage circuit and the CAN bus:

    Why this is dangerous: The error indicates that the onboard charger has “frozen” or completely lost communication with other units via the CAN bus. Due to the absence of a valid signal, the central controller shuts down the entire powertrain for safety reasons.

    • P1A71:01 – On-board charger/DC voltage converter module – electrical malfunction.

    Why this is dangerous: a direct indication of physical or electrical damage inside the charger’s power board (short circuit, breakdown of switches or power stages).

    • P0AF8:64 - Traction battery sections—incorrect signal.

    Why this is dangerous: The battery management system (BMS) detects an incorrect response or voltage from the power circuit due to a faulty converter. This leads to the emergency disengagement of the high-voltage contactors and a complete shutdown of the vehicle.

    Verdict: The on-board charger (OBC, original part number 16 955 245 80) burned out due to an internal electrical short circuit.

    A common issue with Stellantis electric vehicles

    The Citroën e-C4 is built on the Stellantis Group’s shared electric platform (e-CMP). Owners of other models in this series—the Peugeot e-208, Peugeot e-2008, Opel Corsa-e, Opel Mokka-e, and DS 3 Crossback E-Tense—often encounter similar malfunctions. The on-board charger in these vehicles is also a known weak point.

  2. Step 2 of 3

    Step-by-step procedure at the STS.Electro workshop

    1. Safe de-energization of the high-voltage system: deactivation of the high-voltage service disconnect switch (Service Plug), verification that there is no voltage on the power buses to ensure the technicians’ safety.
    2. Removal and troubleshooting: removing the lower protective cover, partially disassembling the front section of the cooling circuit, and removing the burnt-out unit.
    3. Selection and replacement of the charger: a new original charger from an authorized dealer can cost 10,000 zlotys. Thanks to their own logistics and a well-established network of suppliers, STS.Electro specialists found and delivered a genuine, functional unit for nearly half the price.
    4. Installation and integration: installation of the new OBC, connection of high-voltage connectors, the liquid cooling circuit, and the low-voltage CAN network wiring.
    5. Software adaptation and error clearing: The firmware update and integration of the new unit into the vehicle’s onboard network were performed using specialized equipment. All persistent errors (U12DE:81, P1A71:01, P0AF8:64) were successfully cleared.
    6. Testing: A full test cycle was conducted—AC charging, operation of the 12V DC/DC converter, connection of the traction battery contactors, and a test drive.
  3. Step 3 of 3

    Cost Savings for the Customer

    An authorized service organization (ASO) offered to replace the charger at a price of up to 10,000 zlotys for the unit alone, not including the high cost of labor and the lack of any guarantees regarding turnaround time.

    At STS.Electro, we solved the problem much more cost-effectively:

    • Replacement part: We sourced and delivered an original charger for nearly half the price offered by the dealer.
    • Labor and diagnostics: the cost of computer diagnostics, as well as removing and installing the unit at our service center, turned out to be significantly lower than the authorized service center’s price.

    As a result, the owner not only saved a significant amount on the repair but also got his Citroën e-C4 back in working order in just a few days, instead of waiting months at an authorized service center.

Need high-quality electric vehicle repairs in Warsaw?

Modern electric vehicles require in-depth knowledge of high-voltage engineering and specialized diagnostic equipment. The specialists at STS.Electro perform precise fault diagnosis, repair, and replacement of control units, on-board chargers (OBCs), inverters, and traction batteries for all EV and HEV brands.
Don’t waste months waiting—entrust your electric vehicle to the professionals!

Other cases

Subscribe to news!